Español
中文(繁體)
中文(简体)
History
Supply
Demand
Conclusion
Overview
Conclusion
The capacity of copper smelter in China is far greater than that of local copper ore supply, such imbalance is long term problem for those leading copper companies. Their survival depends a stable supply of raw material.
© 2014 China Dynamics (Holdings) Limited Disclaimer & Copyright (All Rights Reserved)